← Company experience record
Roads + bridges
Mpenjane River Bridge
Bridge delivery through design documentation, supervision, measurement, quality control and completion.
Client environmentKwaZulu-Natal Department of Transport
Appointment routeHCE subconsultancy appointment
LocationKwaZulu-Natal
Delivery periodFebruary 2020 – March 2022
R5.78mRecorded construction value
3 stagesPreliminary, detailed and supervision
2022Recorded completion year
01 • Client requirement
The outcome the commission required.
The commission required continuity from the design decision through construction supervision so that the completed crossing remained connected to the approved design intent.
02 • HCE appointment
Defined scope. Controlled attribution.
Deliver preliminary design, detailed design and construction supervision for the river-bridge commission.
03 • Engineering response
Technical input connected to delivery.
- Completed the preliminary design stage.
- Developed the detailed design for implementation.
- Provided construction supervision through project completion.
04 • Verified delivery outcome
What the source record confirms.
- The completion reference records the activities as exceptionally well completed.
- The appointing consultant recommended HCE for future work.
- The record demonstrates end-to-end bridge delivery across design and construction.